Development of metal structures and performing calculations of the buffer warehouse of car bodies for the wheeled vehicles plant of JSC Mercedes-Benz RUS, for OOO MesTas, Kaluga

Specialists of the engineering company ComplexCAD developed a complete set of structural engineering drawings and carried out a stability and strength calculation for the manufacture of the Buffer Warehouse of Automobiles (Automated Storage and Retrieval System)  according to the specifications from the Customer.  Designing a complete set of drawings (1,730 pieces) was carried out within 1 month. The drawings were made on 3D models, also developed by our specialists. Further,  MesTas OOO , our reliable partner, made a complete installation of the designed structure within 2 months.The full cycle of manufacturing products from the development of a set of drawings to complete installation was three months.

(All materials shown below are presented with the permission of the Customer.)

Mers7 Mers5 Mers12 Mers8Mers6Mers4Mers3Mers1Mers2Mers13Mers9 Mers10Mers11

Project Request Application

Related Projects:

Development of metal structures and structural engineering drawings of a bag filter

Development of design documentation package and structural engineering drawings, a reamer set for drum filter cutting

Development of structural engineering drawings of twelve bunkers

Development of automated storage and retrieval system (ASRS)

Development of design documentation package of heat chamber